Search
Now showing items 1-3 of 3
Modeling and dynamic analysis of a membrane bioreactor withbackwash scheduling
(2012-03)
A dynamic model, based on mass transport and reaction rate laws of biomass and substrate for a membrane bioreactor (MBR), was successfully developed. Furthermore, an empirical model for flux prediction was used. Key kinetic ...
Process design of waste gas treatment from Emirates Gold Refinery
(2011-06)
In this case study, the process modifications and improvement to the existing process at the Emirates Gold refinery (in order to meet the United Arab Emirates (UAE) nitrogen oxides air emission regulations) is presented. ...
Performance assessment of a pilot-size vacuum rotation membrane bioreactor treating urban wastewater
(2011-12)
This study investigated the suitability and performance of a pilot-scale membrane bioreactor (MBR). Huber vacuum rotation membrane (VRM 20/36) bioreactor was installed at the Sharjah sewage treatment plant (STP) in the ...