Show simple item record

dc.contributor.advisorBahroun, Zied
dc.contributor.advisorHariga, Moncer
dc.contributor.authorAminipour, Armin
dc.date.accessioned2015-05-27T04:24:17Z
dc.date.available2015-05-27T04:24:17Z
dc.date.issued2015-06
dc.identifier.other35.232-2015.14
dc.identifier.urihttp://hdl.handle.net/11073/7793
dc.descriptionA Master of Science thesis in Engineering Systems Management by Armin Aminipour entitled, "Cyclic Production Scheduling with Remanufacturing," submitted in June 2015. Thesis advisor is Dr. Zied Bahroun and thesis co-advisor is Dr. Moncer Hariga. Soft and hard copy available.en_US
dc.description.abstractThe cyclic production scheduling problem is concerned with the development of a least-cost cyclic production schedule for a set of tasks required to produce a set of products over a given production cycle and according to a given delivery schedule. Recently, remanufacturing of used products has become an important area of research due to its environmental and economic benefits. Consequently, many organizations integrated manufacturing and remanufacturing operations to optimize their forward and reverse supply chain processes. There are some studies that have been conducted on cyclic production scheduling, remanufacturing, as well as cyclic production scheduling with remanufacturing systems, which have led to the development of different optimization approaches. But to the best of our knowledge, none of them considered cyclic deliveries in order to build cyclic production schedules integrating both manufacturing and remanufacturing. Therefore, the focus of this research is to develop a mixed integer linear programing model for an integrated cyclic production scheduling with remanufacturing system to satisfy a given cyclic delivery schedule while minimizing the total holding and setup costs under the assumption of a delivery cycle of one week discretized into smaller periods. A sensitivity analysis is conducted by varying the model parameters to study the limits of the developed model and illustrate the effect of these variations on the total holding and setup costs as well as the computational time. The results of the sensitivity analysis indicate that thirty minutes would be the best period length for the developed model. These results also validate the capability of the developed model in solving the problem at hand and finding the optimal, near optimal, and good feasible solutions for a period length equal to thirty minutes. Further, increasing the number of decision variables or increasing the amount of scheduled deliveries and returns will result in the computational time to increase exponentially. Also, varying the holding cost or increasing the return rate will result in an increase in the computational time. Finally, increasing the holding cost or increasing the return rate will result in an increase in the total holding and setup costs.en_US
dc.description.sponsorshipCollege of Engineeringen_US
dc.description.sponsorshipDepartment of Industrial Engineeringen_US
dc.language.isoen_USen_US
dc.relation.ispartofseriesMaster of Science in Engineering Systems Management (MSESM)en_US
dc.subjectCyclic Production Schedulingen_US
dc.subjectCyclic Delivery Schedulesen_US
dc.subjectProduction Schedulingen_US
dc.subjectRemanufacturingen_US
dc.subjectGreen Supply Chainen_US
dc.subjectReverse Logisticsen_US
dc.subject.lcshProduction schedulingen_US
dc.subject.lcshRemanufacturingen_US
dc.titleCyclic Production Scheduling with Remanufacturingen_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record