Integrated Material Lot Sizing and Multi-Resource Leveling Models with Activity Splitting
(2015-01)In the project management literature, project scheduling and material procurement problems are often studied separately and are addressed following a sequential approach. The few papers in the literature that integrated ... -
Total Damages Quantification Method for Float Allocation
(2016-07)Construction projects involve several contracting parties such as clients, contractors, consultants and many others. These contracting parties tend to use the float of noncritical activities for their own benefits, such ...